Skip to main content

Project overview

Works in progress

Renovation of the bridge and overpass structures: new supports and a new deck are being installed, together with new asphalt surfacing, waterproofing, safety barriers and railings. The stormwater collection and drainage systems are being repaired, slopes reinforced, lighting installed, and a new retaining wall constructed beneath the overpass.